R-3 As-of-Right Zone

Build a Laneway Suite & ADU in Antigonish

Fixed-price laneway suite & adu construction in Antigonish — 1 units from $140,000/unit with 6-month construction guarantee.

Laneway Suite & ADU
1-Unit Building
Starting Price $151,200
Est. Monthly Rent $2,000+
Target Cap Rate 5%
Zoning R-3 As-of-Right
Build Time 6 mo
$140,000
Per Unit Cost
R-3
Primary Zone
6 mo
Build Time

Why Build a Laneway Suite & ADU in Antigonish?

Antigonish is an excellent location for laneway suite & adu development with strong rental demand.

Fixed-Price Construction
Helio builds your laneway suite & adu at a fixed price of $140,000/unit — no cost overruns, no surprises. Total starting price: $151,200 including soft costs.
Rental Income Potential
Antigonish offers strong rental demand. At $2,000/unit/month, your 1-unit building could generate $2,000+/month in rental income.
R-3 Zoning
Antigonish's R-3 zoning supports laneway suite & adu development. As-of-right approval means faster permitting and lower development risk.
CMHC Design Available
Pre-approved CMHC-equivalent designs are available for this building type, potentially qualifying for enhanced financing through CMHC MLI Select with reduced rates and longer amortization.

Development Timeline

What to expect when building a Laneway Suite & ADU in Antigonish.

Step 1

Site Assessment & Feasibility

Evaluate lot size, setbacks, coverage limits, and site conditions. Determine ADU placement, size, and design options. Confirm zoning compliance and identify any variances needed.

Step 2

Design & Documentation

Develop architectural plans including floor plans, elevations, and site plan. Coordinate structural, mechanical, and electrical engineering. Prepare permit application package.

Step 3

Permit Application

Submit building permit application with required documentation. ADUs typically qualify for streamlined review as-of-right development. Obtain Halifax Water and other utility approvals.

Step 4

Pre-Construction

Finalize contractor selection and pricing. Order materials and schedule trades. Plan construction access and staging. Notify neighbors if required.

Step 5

Construction

Complete foundation, framing, roofing, and exterior finishes. Install mechanical, electrical, and plumbing systems. Complete interior finishes and landscaping restoration.

CMHC
Pre-Approved CMHC Design Available
This building type has CMHC-equivalent designs ready to build, potentially qualifying for faster approvals and enhanced financing through CMHC MLI Select.
View Designs

Frequently Asked Questions

Ready to Build in Antigonish?

Helio is actively building in the greater Halifax area. Get a quote for your specific lot.

No obligation. We respond within 24 hours.

Get Quote Call Now